UAB "Litesko", Alytaus RK

Technical project implementation. Construction of 9,2 MW turbine generator set, which consists of a turbine generator, steam supply system (steam supply to the turbine, desuperheater, preheating), oil system (oil supply to the turbine and generator bearings, shaft turning device and control system), cooling system, water system (installation of heaters with built-in condensate cooler), condensate drain system, equipment for automatization, control, regulation, protect and switching on generator to the distribution network.

Execution of pre-commissioning, start-up and plant handover for commissioning.