PAS "Daugavpils siltumtīkli"

By the order of "Daugavpils siltumtīkli" on heating power plant Nr. 3 at st. November 18, 2, Daugavpils, reconstruction was made. The purpose of reconstruction - to install a new 15 MW power boiler with automatic burners for combustion of natural gas + accessories, including network new pump. The project covers design and installation of the boiler, its connection to the existing gas line, water supply system and chimneys. Moreover, the design and installation of the recirculation pump to maintain a minimum water temperature of 70 ° C before the pump, regulating and safety valves and control devices.20160525 090513

20160525 085530

20160525 085440

20160525 085258