AB "Panevėžio energija"

Panevezys, Lithuania
2014

Main steam reduction equipment modernization

 Desuperheater system designing and installation. Execution of pre-commissioning, start-up and plant handover for commissioning. Completed project assured following modernization of power-plant equipment:

  • quick equipment start-up when steam turbine is stopped, ensuring continuous operation of gas turbine, boiler and condenser;
  • long-term power station performance during boiler operation without steam turbine;
  • equipment remote control from CVP during authorized steam turbine shutdown or operating without it.