AB "Panevėžio energija"
- Category: Our project
Panevezys, Lithuania
2014
Main steam reduction equipment modernization
Desuperheater system designing and installation. Execution of pre-commissioning, start-up and plant handover for commissioning. Completed project assured following modernization of power-plant equipment:
- quick equipment start-up when steam turbine is stopped, ensuring continuous operation of gas turbine, boiler and condenser;
- long-term power station performance during boiler operation without steam turbine;
- equipment remote control from CVP during authorized steam turbine shutdown or operating without it.