Equipment , Equipment for boiler houses / power plants


turbine

JSC “Gandras Energoefektas” - design, supply, warranty service of electricity and heat supply plants.

Any electricity supply source building up purpose – ensure uninterrupted electricity supply and save on electricity purchase.

If you need and have a serious intention to build up your own heat and electricity source, please contact us and we together with you will evaluate existing equipment, offer to your choice 1-2 electricity sources, and will help you to prepare feasibility study documentation for the Bank.

We can supply to You equipment package, fulfill design, installation and start-up works, train Your personal.

Biomass firing plants are working with renewable energy sources, this permit to sell produced electricity at higher price (as “green” electricity), but at the same time it applies restriction on produced heat energy after steam turbine and electrical energy ratio (it should be not less than 23 %).

We offer the operatio visualization automated systems, which are constructed in terms of programmed digital controllers for automatic control of the STEAM, GAS and HYDRO-TURBINES, COOLING SYSTEMS, OIL FEEDING, VENTILATION equipment, information acquistion and handling, and also warning system.


Equipment , Equipment for boiler houses / power plants , Boilers , Biomass boilers

Company “GANDRAS ENERGOEFEKTAS” offers biomass fired boilers.
In EU countries in primary energy producing biomass usage is quite high (66.1 %) comparing with other renewable energy, and takes the third place on electricity production, yielding to hydro- and wind-power engineering.
Biomass is:

  • wood,
  • vine (fast-growing trees, such as poplars, willows, and grasses, such as millet),
  • woodworking wastes (bark, sawdust,  boards cuttings, shaving),
  • agriculture wastes (sugar-cane cake, maize (corn) roots and stems, rise husk, straw, nutshell),
  • used paper.11

Our offered boilers range include:

  • Small capacity boilers up to 5 MW
  • Medium capacity boilers from 7 MW up to 75 MW
  • Pre-assembled biomass boiler-room with silo in containers


Equipment for boiler houses / power plants , Boilers , Biomass boilers , Small capacity biomass firing water heating boilers


JSC “GANDRAS ENERGOEFEKTAS” offers boilers for different kind of pellets and wood logs burning.


TECHNICAL DATA

Thermal capacity   
automatic boilers: 14 kW - 1163 kW
manual boilers: 29 kW - 930 kW

Fuel 
for automatic boilers: wood pellets, agropellets agropellets (for example, cotton waste) , straw pellets , sun flower husk pellets, peat pellets (max. humidity up 25 %).
for manual boilers: wood logs and wood pieces.

These boilers can be used for production of how water with max. temperature 110 C and max. working pressure 6 bar.

 Manual fuel supply boilers    Automatic fuel supply boilers 14-290 kW    Automatic fuel supply boilers 348-1163 kW
 manuel04-en    automatic-small-1-en    Automatic fuel supply boiler
 Котел с ручной подачей топлива    Automatic fuel supply boiler front view    Automatic fuel supply boiler rear view

  SHORT DESCRIPTION:
Monoblock design boilers made of steel with smoke tubes have special turbulence promoters to increase boiler operation performance.
Boiler has two separate doors for tube part and combustion chamber inspection.
Fuel supply to the boiler can be in automatic mode or manually.
In case of automatic fuel supply boiler will be supplied with receiving bin, which has fuel level switches, ensuring fuel supply system switching on (in case of fully automatic boiler plant operation) or gives signal to the personal about low fuel level. There is also minimum fuel level switch, achieving which boiler’s automatic system stops it.
It is possible to supply automatic ignition system.
It is possible to supply modulation system, which will keep automatically adjusted outlet water temperature in the same time adjusting quantity of supplied to the boiler fuel and combustion air. 
In case of automatic fuel supply, ashes, which appear in the combustion chamber, are removing automatically by means of two screw conveyors to the ashes collecting containers.

Boilers are manufactured in accordance with International standard TÜV CERT and have CE marking.
Warrantee time for these boilers is 2 years.


We are ready to offer You complete boiler plant on turn-key basis with all required equipment:
- Vertical or horizontal silos for fuel storage,
- Moving floors,
- Vertical or horizontal fuel supply to the boiler transporters,
- Boilers with automatic fuel supply and ash removing system,
- Automatic smoke tubes surfaces cleaning system,
- Economizer,
- Multicyclon (smoke filter),
- Chimney,
- Automatic control system (PLC),
- Remote monitoring system

Fully automatic boiler plant example

 Local boiler plant Kalkuni, Daugavpils, Latvia - 3 boiler with 400 kW heating capacity each. 

Fuel receiving bunker, vertical fuel loading to the storage silo elevator, 80 m3 capacity storage silo.   Boilers with receiving bins and fuel supply transporter   Automatic smoke tubes surfaces cleaning system
fuel receiving and storage   boiler with feeding bunker and fuel supply transporter   automatic cleaning system
         

Equipment

Установка с горизонтальной подачей топлива со железо-бетонными конструкциями и движущимися полами

Equipment for boiler houses / power plants

deaerator

Deaerators

sistemy_avtomat_upravlenija_turbin

Turbines and alternators control systems

pump

Pumps

cooling-tower-main

Cooling towers

setball

Control valves

dlia_elektrosetej2

Electrical supply network equipment

084

Filters

sb

Grinders

044

Actuators for valves

elektrosnabzhenije_na_solnech_batarejah

Solar Energy Systems

side-entry-mixer1

Mixers

Установка полной механической очистки сточных вод

Equipment for water treatment systems

cdengeenir061

On/Off valves

ulichnoe_osveschenije

Street Lighting Equipment

musorovoz

Desuperheaters


Equipment , Equipment for boiler houses / power plants , Power plants complete with diesel and gas engines

JSC “Gandras Energoefektas” offers electric power plants complete with diesel and gas engines for electricity and heat production.
Gas and diesel engine sets differ by its reliability and high efficiency values operating in heavy duty conditions. In engines construction are user new very resistant materials, which increase engine lifetime.
Power plants can be supplied like opened or packaged sound-proof units.

We offer:

  • Cogeneration units on a basis of diesel and gas engines with power range from 65 kWe up to 3000 kWe
  • Diesel generator sets with power range from 5 kW up to 2000 kW.

By customer’s request diesel generator can be completed with:

  • Sound insulation, which allow to install diesel generator set in living quarters,
  • Required configuration and quantity of sockets,
  • Automatic engine start-up function in case of electricity loss (stand by conditions).

Cogeneration units on a basis of  gas engines with a power range from 65kW up to 3000 kW.

We can offer to the customer engine depend on chemical gas composition (gas from dumps, product fermentation or etc.).

Main advantages of gas engines offered by JSC “GANDRAS ENERGOEFEKTAS”:

  • Open type combustion chamber is used - in contrast to engines with preliminary combustion chamber, engine’s temperature regime is less strained, what secure longer life time   
  • Running on a lean mixture of fuel and air, this design significantly reduces the production of nitrogen oxides (NOx) and increases fuel efficiency. The result is a generator set with a high power output, maximum thermal efficiency and NOx emissions as low as 0.7 grams per brake horsepower–hour
  • Can operate at very low gas pressure – up to 0,2 bar abs. – it is not required to install additional compressor station.
    co-generation sets are fully completed with digital control system, which secures automatic synchronization, units putting into parallel operation and load distribution.
  • Integrated into control system algorithm digital control of active and reactive powers distribution result in minimizing of power losses when several station operate in parallel. Total power losses, in that way, do not exceed 0,5 %.
  • It is possible to supply co-generation plant in container, designed for outside installation, and also in canopy which allows to reach noise level inside of the plant in accordance with EU Norms.  

 

Typical applications

  • Hospitals
  • Greenhouses
  • Hotels
  • Industrial / Chemical Plants
  • Manufacturing Facilities
  • Commercial Facilities
  • Government Facilities
  • Colleges and Universities
  • Food Processing Plants
  • Health Clubs
  • Swimming Pools
  • Nursing Homes
  • District Heating
  • Landfills and Sewage Treatment Plants
  • Coal Mining and Oil Fields

 

Области применения ко-генерационных установок

Co-generation plant with gas engine operating principle co-generation-unit-operation-principle

Utilizing produced by engine heat it is possible to:

- produce hot water for heating systems and technology 

co-generation-hot-water-_eng 

- produce low parameters steam

co-generation-steam-_eng

Also internal-combustion engine could be used in tri-generation process - combined electricity, heat and cold producing, by means of  co-generation unit combination with absorbtion cooling plant (chiller).

tri-generation_eng

Equipment , Equipment for boiler houses / power plants , Deaerators


Deaerators are used to remove the corrosive gases (oxygen and free carbonic acid) from feeding water of steam generating units and from makeup water of heat and hot water supply systems.

We offer the folowing deaerators types:

  • atmosphere pressure deaerators (absolute working pressure 1,2 bar); capacity from 5 to 100* t/h
  • vacuum deaerators (absolute working pressure lower than atmosphere); capacity from 5 to 100* t/h
  • membranous deaerators; capacity from 30 l/h – 90 000 l/h

* Basing on serial produced deaerators could be designed and manufactured others modifications in accordance with Customer’s parameters.



Equipment , Sorting line

Wastes sorting line

sort_visag_out1

JSC „Gandras energoefektas” performs a full range of works, concerned with designing and construction of wastes sorting lines with an output starting from 5 000 ton a year. We will provide you with ultimate solutions for the content of the equipment and its’ location according to the size of the facility and your financial possibilities.

JSC ”Gandras Energoefektas” implemented the project on purchasing and implementing wastes sorting line and plastic processing line in Visaginas in 2011.

The purpose of wastes sorting line

Manual wastes sorting into grades ready for its further press and supply.

Main components:

It is possible to ask for optional equipment to be supplied.

We guarantee:

  • Good quality of certified equipment;
  • individual approach to each order;
  • reasonable price;
  • short production terms;
  • 12 months warranty;

sort_visag1

Feeding chain conveyor is designed to feed unsorted garbage to sorting line. All wastes are moved to the dibhole of the feeding conveyor and later are fed up to sorting belt conveyor. Angle of feeding conveyor inclining reaches 35 degree.

sort_visag2

Sorting belt conveyor is mounted on the sorting platform and designed for sortable recyclable materials transportation and hand picking. While selecting appropriate grades worker drops it down to the hopper. Along the sorting conveyor there are working places with chutes. Each working place has emergency stop button. Part of selected material (waste paper, PET, plastics etc.) is going down to accumulating areas through the chutes.

sort_visag3

Sorting platform is an essential element of sorting complex, what is necessary for more efficient selection (quantitative and qualitative) of useful grades from the stream. On the sorting platform there are mounted sorting conveyor and working places for workers to select appropriate grades from the wastes mainstream. Sorting platform completed with the modular room and screening drum. Screening drum is designed to sieve wastes stream. In the wastes sorting line screening drum is the first stage of sorting wastes. Operating principle of screening drum is to screen the material from small grades through the drum holes. Modular room is equipped with work places (number of required work places is being defined according to the requested output of wastes sorting line), where each working place has emergency stop button. Room is equipped with heat recuperating ventilation systems and electrical heaters.

sort_visag5

Single-chamber hydraulic baler complete with feeding chain conveyor and PET perforator. Working with a paper PET perforator automatically shutdown. Hydraulic baler is automatically controlled with PLC control panel. Single-chamber hydraulic baler is designed to press recyclable materials into bales with specified sizes.

sort_visag5

Reversible belt conveyor is designed to transport wastes, which left after selecting useful grades to an opened container, located under the conveyor belt from one side or to transport sorted recyclable material to feeding belt conveyor to hydraulic baler from the other side. Material feeding can be performed to the left or right side, what ensures complex non-stop operation.

Sorted recyclable wastes are feeding to the press by feeding chain conveyor (Z type). Angle of feeding conveyor inclining reaches 35 degree.

Certificates

Certificates of the management systems according to ISO standards

iso-9001-en  
iso-14000-en
 
gandras_ohsas18001_2007_original_en
 
iso_3834

 

Certificates of Ministry of Environment of the Republic of Lithuania

gandras_atestatas-2058
 
dmitrij_podcernin_25967_projektavimas-ir-darbu-vadovas 
 
igor_kovaliov_26709 
 
 ruslanas_babicius_4536_projektavimas1
   ruslanas_babicius_4188_darbu_vadovas1

 

 Certificates of State Energy Inspectorate by Ministry of Energy (Economy) of the Republic of Lithuania

T-0828
 
T-0828
 
gandras-e-0753_1
 
gandras-e-0753_2

Сompleted projects

№  Description   Site location Realization time
1.   Alytus heating station network pumps reconstruction   Alytus, Lithuania   2012
2.   Heating, hot and cold water pipelines renovation   Panevezys, Lithuania   2012
3.   Local boiler plant Staneliai reconstruction   Plunge, Lithuania   2011
4.   Main steam reduction and cooling equipment (desuperheater system) modernization   Panevezys, Lithuania   2011
5.   Pump station in Grigiskes construction and design   Grigiskes, Lithuania   2011
6.   Installation of recyclable wastes sorting complex   Visaginas, Lithuania   2011
7.   Gegrenai village public works building boiler installation works   Plunge, Lithuania   2011
8.   Modernization of Sirvintos town heat supply system by installing cogeneration plant in Sirvintos boiler house   Sirvintos, Lithuania   2011
9.   Local boiler plant Kalkuni reconstruction with erection of three water heating boiler with 400 kW capacity each and automatic fuel receiving, storage and supply to the boilers system   Daugavpils, Latvia   2010
10.   Design, supply and erection of 8 MW biomass fired water heating boiler complete with furnace and auxiliary equipment   Mazeikiai, Lithuania   2010
11.   Panevezys gas compressor station process water system equipment modernization   Panevezys, Lithuania   2010
12.   Supply of swivel angel mixers to maintain homogeneity of Oil Products in 5000 m³, 10000 m³, 20000 m³ tanks   Ventspils, Latvia   2010
13.   Modernization of the lighting network in Visaginas   Visaginas, Lithuania   2010
14.   Supplying of garbage trucks   Visaginas, Lithuania   2009
15.   Supplying of garbage containers with capacity of 0,77 м³ and 1,1 м³   Visaginas, Lithuania   2009
16.   Designing and supplying of equipment for complex light oil products pumping station   Ventspils, Latvia   2009
17.   The construction of the cooling system of the plant for the production of automotive parts in the city Marijampole   Marijampole, Lithuania   2009
18.   Supply of automatic vacuum deaeration system   Panevezys, Lithuania   2009
19.   Designing and construction of backpressure steam turbine with power output of 9.2 MW   Alytus, Lithuania   2008
20.   Supplying of garbage trucks   Visaginas, Lithuania   2007
21.   Reconstruction of district boiler house power supply system   Panevezys, Lithuania   2007
22.   Construction of 0,75 MW steam turbine generator with auxiliary equipment in Berzes district boiler house   Taurage, Lithuania   2006

Сompleted projects

d98501333393232587

UAB „CIE LT FORGE“ 2009 year

The construction of the cooling system of the plant for the production of automotive parts in the city Marijampole.

Design and construction of cooling towers, cooling system pumps with frequency converters, submersible pumps, water treatment equipment, piping made of stainless steel. Execution of pre-commissioning, start-up and plant handover for commissioning.

10092009130     10092009129     10092009128