Сompleted projects

Сompleted projects

№  Description   Site location Realization time
1.   Alytus heating station network pumps reconstruction   Alytus, Lithuania   2012
2.   Heating, hot and cold water pipelines renovation   Panevezys, Lithuania   2012
3.   Local boiler plant Staneliai reconstruction   Plunge, Lithuania   2011
4.   Main steam reduction and cooling equipment (desuperheater system) modernization   Panevezys, Lithuania   2011
5.   Pump station in Grigiskes construction and design   Grigiskes, Lithuania   2011
6.   Installation of recyclable wastes sorting complex   Visaginas, Lithuania   2011
7.   Gegrenai village public works building boiler installation works   Plunge, Lithuania   2011
8.   Modernization of Sirvintos town heat supply system by installing cogeneration plant in Sirvintos boiler house   Sirvintos, Lithuania   2011
9.   Local boiler plant Kalkuni reconstruction with erection of three water heating boiler with 400 kW capacity each and automatic fuel receiving, storage and supply to the boilers system   Daugavpils, Latvia   2010
10.   Design, supply and erection of 8 MW biomass fired water heating boiler complete with furnace and auxiliary equipment   Mazeikiai, Lithuania   2010
11.   Panevezys gas compressor station process water system equipment modernization   Panevezys, Lithuania   2010
12.   Supply of swivel angel mixers to maintain homogeneity of Oil Products in 5000 m³, 10000 m³, 20000 m³ tanks   Ventspils, Latvia   2010
13.   Modernization of the lighting network in Visaginas   Visaginas, Lithuania   2010
14.   Supplying of garbage trucks   Visaginas, Lithuania   2009
15.   Supplying of garbage containers with capacity of 0,77 м³ and 1,1 м³   Visaginas, Lithuania   2009
16.   Designing and supplying of equipment for complex light oil products pumping station   Ventspils, Latvia   2009
17.   The construction of the cooling system of the plant for the production of automotive parts in the city Marijampole   Marijampole, Lithuania   2009
18.   Supply of automatic vacuum deaeration system   Panevezys, Lithuania   2009
19.   Designing and construction of backpressure steam turbine with power output of 9.2 MW   Alytus, Lithuania   2008
20.   Supplying of garbage trucks   Visaginas, Lithuania   2007
21.   Reconstruction of district boiler house power supply system   Panevezys, Lithuania   2007
22.   Construction of 0,75 MW steam turbine generator with auxiliary equipment in Berzes district boiler house   Taurage, Lithuania   2006