Our completed projects
We present to your attention our already completed projects: task, detailed description, results, experience gained
Improving the efficiency of biofuel boilers: installation of a primary air heater.
PAS „Daugavpils siltumtikli“
Daugpilis, Latvia
2025
Full Automation of Flue Gas Heat Recovery Systems: From Budget Savings to Maximum Efficiency, Safety, and Payback
PAS „Daugavpils siltumtikli“
Daugpilis, Latvia
2024-2025
Reconstruction of Daugavpils heating plant No. 3 with installation of compressor heat pumps
PAS „Daugavpils siltumtikli“
Daugpilis, Latvia
2024-2025
Boiler house "Križi" adaptation for work with liquefied petroleum gas
PAS „Daugavpils siltumtikli“
Daugavpils, Latvia
2024
Installation of a 450kW double suction network pump
PAS „Daugavpils siltumtikli“
Daugavpils, Latvia
2024
Installation of a 450kW double suction network pump
PAS „Daugavpils siltumtikli“
Daugavpils, Latvia
2023
Installation of a double suction network pump with a power of 315 kW
AB „Vilniaus šilumos tinklai“
Vilnius, Lithuania
2022
DAUGAVPILS IS PREPARING FOR HYDROGEN BURNING
PAS „Daugavpils siltumtikli“
Daugpilis, Latvia
2021
Installation of a sewage pump with reconstruction of suction and discharge pipelines
UAB „Vilniaus vandenys“
Vilnius, Lithuania
2021
Installation of a domestic wastewater shredder
UAB „Visagino energija“
Visaginas, Lithuania
2021
Installation of a double suction network pump with a power of 200 kW
UAB „Mažeikių šilumos tinklai“
Mažeikiai, Lithuania
2021
Increasing the efficiency of condensing economizers using heat pumps
AB „Šiaulių energija“
Šiauliai, Lithuania
2020
Installation of a double suction network pump with a power of 315 kW
PAS „Daugavpils siltumtikli“
Daugavpils, Latvia
2020
